Item added to your cart
Description
Troy Lee Designs Flowline MTB Helmet
The Troy Lee Designs Flowline MTB Helmet delivers top-tier protection, comfort, and ventilation in a sleek, minimalist design—all at an affordable price. Engineered with Mips® B-Series Rotational Impact Protection, a full 360-degree fit retention system, and extended coverage, this helmet ensures premium safety and all-day comfort for trail riders.
Key Features
- Mips® B-Series Protection – Reduces rotational forces in the event of a crash.
- 3-Way Adjustable Screwless Visor – Easy customization for sun and debris protection.
- Full 360° Fit Retention System – Secure, comfortable, and adjustable fit.
- 14 Vents – Maximized airflow to keep you cool.
- Full Wrap In-Mold Construction – Lightweight yet highly protective shell.
- Extended Coverage – Increased protection for trail riding.
- Side Strap Adjusters – Quick and easy fit adjustments.
With a Five-Star Safety Rating from Virginia Tech, the Flowline MTB Helmet is built for riders who demand reliable performance, comfort, and protection—without breaking the bank.
Troy Lee Designs
Troy Lee Designs Flowline MTB Helmet - Point - Black-Charcoal
Troy Lee Designs Flowline MTB Helmet - Point - Black-Charcoal
Product ID: HE5503
Shop all Troy Lee Designs | Shop all MTB Helmets
View full details

Ratings & Reviews
Overall rating: 0.0 / 5 from 0 reviews.
AI Generated Review Summary
Summary topics
Review topics: [].