Item added to your cart
3-FOR-2





3-FOR-2





Description
The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
- 3-Way adjustable screwless visor
- NTA-8776 certified for E-Bike usage
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Side strap adjusters
- 5-Star Virginia Tech safety rating
Troy Lee Designs
Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Oasis Blue-Black - 2023
Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Oasis Blue-Black - 2023
3-FOR-2 ON THIS ITEM
MIX AND MATCH / SHOP ALL 3-FOR-2
Product ID: BW012423-50
Only 1 Items Left
Shop all Troy Lee Designs | Shop all MTB Helmets
View full details



